The Renfe station of Vitoria has launched a new communication system that provides information on schedules, Special warnings and incidents through four indicators -one per platform- Double-sided and five state-of-the-art monitors, in addition to two cameras for the control of circulations.

Within the process of remodeling and modernization of the Vitoria-Gasteiz station, Adif has completed the installation of a new information system on rail traffic enabled by the company Icon Multimedia. The system, powered by Deneva solution, Provides timely information on timetables, Special Notices, Incidents, Etc., through teleindicators, Monitors and public address system. To do this, It has four double-sided track teleindicators, Five state-of-the-art monitors (two 47" and three 42") to provide information to the public and two cameras for the control of circulations.

The system is connected to the Centralized Traffic Center (CTC) of Miranda de Ebro, which incorporates additional information on automatic train planning and tracking. In addition, in case of disconnection, The system has two stations that allow its control from the Vitoria-Gasteiz station itself.

Energy efficiency and savings

likewise, The new information system allows to adjust the lighting of the platforms according to the arrival of the trains, with consequent energy and cost savings. In this way, by means of a programmable logic controller responsible for controlling the lighting circuits, The platforms will be illuminated at the 33% when there are no trains, to the 66% half an hour before your arrival, and 100% in the previous five minutes.


You liked this article?

Subscribe to our RSS feed And you won't miss anything.

Other articles on
by • 12 Apr, 2012
• section: Digital signage, Signal distribution