The last one has been that of Madrid-Puerta Toledo in which the number of classrooms has increased and has been equipped with a complete AV equipment, composed of a double HD projection system of high luminosity and low noise, prepared to work with analog and digital entries, and large format motorized screens.

Vitelsa at Carlos III University

The origin of the Carlos III University from Madrid dates back to 1989, moment in which he was born with the vocation of being an innovative education center, of medium dimensions but with a quality education and a strong commitment to research and new technologies. At the moment, It has a clear international vocation that is characterized by the signing of agreements with universities of more than 52 countries, being part of some of the most prestigious academic rankings in the world.

Vitelsa at Carlos III UniversityIts facilities have more than 270.000 built square meters, that host more than 19.000 students distributed in four campus, Located in the municipalities of Getafe, Leganés, Colmenarejo and Madrid.

Recently, The Madrid-Puerta de Toledo campus has been expanded and Vitelsa has been the company responsible for designing, supply and implement technological equipment.

In the entrance hall a high resolution and luminosity projection system that projects on a large motorized screen has been installed, allowing a shocking presentation of institutional content for visitors and students of the center.

To feed this system, various HD video sources have been installed, Integrated with a sound and microphony system that allow the celebration and monitoring of events in the wide entrance zone.

Within the extension project, the number of classrooms has increased for which an advanced technical design has been prepared that optimizes equipment performance based on the characteristics of the rooms and facilitates daily operability and maintenance with high energy efficiency.

Vitelsa at Carlos III UniversityEach of the classroom has been equipped with a double HD projection system of high luminosity and low noise, prepared to work with analog and digital and visualized entries on large format motor display.

Each of the classrooms has an audio and video infrastructure HD, Specific connectors integrated at the teacher's table, that facilitate the insertion of both formative and multimedia content.

The classrooms have also been equipped with an advanced sound -loudness and wireless microphony that ensures the correct audition of the speakers and facilitates great flexibility in the development of classes. All these devices have been integrated into a single automatic control interface, which allows teachers to complete control of audiovisual resources installed in each classroom thanks to a simple button programmed by Vitelsa.

Vitelsa at Carlos III UniversitySimilar to the implementation in the first phase, In this extension, the creation of a computer classroom has also been taken into account that contemplates the installation of an HD projection system and a large format motorized projection screen, capable of offering a projection of size higher than 100 inches. The classroom is equipped with a complete audio infrastructure, HD video and data, which allows the interconnection of multiple computer and audiovisual devices and ensures the adaptation of formats between them.

To improve the visibility of the video signal in the room, four large format LED Full HD LED monitors have been installed, that provide reinforcement to the main projection system.

The Chamber also has a sound and microphony system to ensure the correct audition of speakers and students in the development of training sessions.

Vitelsa at Carlos III UniversityWithin the same project, the new multimedia classroom has also been equipped with audiovisual equipment composed of a Full HD Robotic HD system and a video realization system with the capacity to perform room streaming in real time.

In the classroom a Full HD video matrix has also been implemented, where multiple video sources are connected (webcams, Videoconferentia) and the HD projection system of the room has been integrated, allowing both the local visualization of signals and its distribution through infrastructure and audio connections, HD video and data.

Additionally, A large format monitor has been installed that allows speakers to follow up presentations.

Vitelsa at Carlos III UniversityThe classroom also has a high quality high quality sound system and microphony equipment at the Presidency table, Left and speakers table, In addition to another wireless system for the entire room.

All the systems of these classrooms have been integrated into a centralized control system, which allows you to easily manage all equipment from a tactile interface.

Finally, the audiovisual equipment of a large number of box rooms has been carried out. These are spaces distributed throughout the campus that are specifically intended for students to organize meetings and work sessions within the enclosure itself.

For the proper development of these sessions, each of these rooms has data connectivity and professional presentation and professionalization equipment available to students of Postgraduate.


    Be Sociable, Share!

You liked this article?

Subscribe to us RSS feed And you won't miss anything.

Other articles about , ,
By • 23 Nov, 2016
• Section: Audio, By conferencing, Study cases, Control, OUTSTANDING, Display, Signal distribution, Formation, Projection